Regional Aviation News Free e-Mail Newsletter Free Aviation Job Alerts
Home Avionics Aviation Maintenance Rotor & Wing Air Safety Week Aircraft Value News Regional Aviation News Very Light Jets
View by Category:  Commercial | Business & General Aviation | Rotorcraft | Air Traffic Control | Maintenance
Advanced Search


Aviation Today Market Leaders
Subscribe
Jobs
Podcasts
Webinars
Videos
Blogs
Databases &
   Buyer's Guides

White Papers/
   Technical Reports/
   Supplements

Research Reports
Article Archives
Press Releases
From the PR Wires
Industry Links

Top Stories
Aviation e-letter
Financial Center
Calendar
Media Kits
About Us
Contact Us

Monday, April 28, 2008

Airbus, Pratt Join to Test GTF

At a time when some are questioning the Geared Turbo-Fan, Airbus and Pratt & Whitney partnered to flight test the engine on an Airbus-owned A340 flying test bed. In a recent press briefing, Embaer Executive Vice President Commercial Aircraft Mauro Kern indicated that the geared turbo fan is not being...

For immediate service; more information; and multi-user access (site license), non-profit organization, educational institute pricing, contact Karen Garner kgarner@accessintel.com at (301) 354-1612.


This story is only available to paid subscribers. Please login below with your username and password if you are a subscriber.

Username:
Password:
  What is my password?

Subscribe     Trial

At a time when some are questioning the Geared Turbo-Fan, Airbus and Pratt & Whitney partnered to flight test the engine on an Airbus-owned A340 flying test bed. In a recent press briefing, Embaer Executive Vice President Commercial Aircraft Mauro Kern indicated that the geared turbo fan is not being studied by other engine makers. Related Story  The engine is already slated for Bombardier’s proposed CSeries and Mitsubishi’s MRJ. Related Story
The Airbus/P&W flight testing will provide first-hand experience with the performance of the Geared Turbofan engine, which targets double-digit improvements in fuel burn, environmental emissions, engine noise and operating costs. The Airbus testing will begin in the fourth quarter of this year and will follow Pratt & Whitney's own ground and flight test program.
"Testing the Geared Turbofan engine throughout its entire operating envelope using the Airbus A340 flight test aircraft, combined with the tremendous experience of the Airbus flight test team, will provide us with valuable installation and operating data to further evaluate the performance of this new engine architecture,” said Todd Kallman, president of Pratt & Whitney Commercial Engines.
Pratt & Whitney's Geared Turbofan demonstrator engine recently began Phase II ground testing at the company's advanced test facility in West Palm Beach, Fla. Phase II of the ground test program will focus on engine performance and acoustic characteristics with a flight-capable nacelle system prior to mid-year flight testing. The Geared Turbofan demonstrator engine has logged approximately 150 hours since ground testing began in November 2007.
The testing could have implications for the CSeries and MRJ as well as the current A320 family, according to Regional Aviation News sister publication Aircraft Value News. “The GTF, while featuring a number of moving parts which could have negative performance implications, offers the promise of lower operating costs, much sought after in the current climate,” said Editor Paul Leighton in his latest issue.
He noted both Airbus and Boeing have recently suggested that a narrow-body replacement will not be available for perhaps another decade. “The development of the CSeries and the MRJ powered by the GTF suggest that alternatives at the lower end of the seating scale will be available much sooner, within five years, posing a problem for Airbus and Boeing alike,” he said. “In any event, the aviation industry may not have the luxury of selecting its own timetable for a replacement should the regulatory authorities push for more environmentally friendly products to be introduced as soon as possible by means of economic penalties.”
Airbus, Leighton noted, stated that “the tests do not imply either a technological or a business decision on future product developments.” However, when Airbus is combating a weak dollar, expenditure on the flight testing of an engine in which it has no interest is a costly exercise, he said.
The GTF could be used as an interim solution to the eventual replacement of the A320 family. An upgrade to the A320, rather than a replacement, would provide breathing space until a more advanced engine can be developed. Such a move would create problems for Boeing as the manufacturer has a long standing relationship with CFMI in supplying engines for the B737 series. A switch to Pratt & Whitney, even as an interim solution, will not be favored.
Leighton also noted there are considerable obstacles to using the GTF on all A320 family members, not least the A321. While development of the GTF is advanced, the power rating of the engine is still at the low end of the power range. Nonetheless, he added, waiting 10 years or more for a new engine is a long time when there are pressures associated with an ageing product life cycle, desire for lower operating costs, and environmental concerns.

Post a Comment

Name:
Email:
Comments:

Please enter the letters or numbers you see in the image.

 
Your message will be reviewed before it is posted.

Copyright © 2008 Access Intelligence, LLC. All rights reserved. Reproduction in whole or in part
in any form or medium without express written permission of Access Intelligence, LLC is prohibited.